Client:                                 Griffith University

Project:                               S02 Level 7 AEL Alterations

Duration:                             Nov 2014 – Mar 2015

Project Value:                    $715,000

Project Details:                We were again pleased to be working with Griffith University, this time at their South Bank Campus. This project involved the complete renovation on the 7th floor of an existing building. Works included such items as new partition walls including a number of glass partitions, new air conditioning, electrical works, ceilings and floor coverings. The existing balcony was enclosed so that the space could be utilised as additional office space and meeting rooms. Extensive demolition works were undertaken to allow for the new floor plan. Forward planning was imperative on this project with access for deliveries of materials and tools via scissor lift only. This renovation was undertaken within an operational environment. Special consideration was given to the implementation of fire requirements. Evacuation points and procedures had to be altered to allow the building to be occupied during the renovation.

Back
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
1426 Griffith University S02
Detail Download
 
 
Powered by Phoca Gallery