Client:                    McNab Constructions Pty Ltd
Project:                 Aldi Foodstore, Gatton
Duration:              July 2008 to December 2008
Project Value:     $780,000
Project Details:  Our contract was to strip the site including tree removal, excavate approx 1.5m into the existing sub grade and remove from site, import approx 15,000m3 of CBR15 material place and compact under level 1 supervision, full pavement construction for the 45 space car park with asphalt, underground detention tank and full installation of a Humes STC3 GPT. This project also had a Main Roads turn in lane of a major intersection with deep lift asphalt construction and Lockyer Regional Council storm water upgrades adjacent to the new Aldi Store.

Back
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
Aldi Foodstore - Gatton
Detail Download
 
 
Powered by Phoca Gallery