Client:                                 WATPAC Specialty Services Pty Ltd
Project:                              Brisbane Boys College, Toowong
Duration:                            November 2009
Project Value:                   $152,000
Project Details:                 Our contract was to undertake bulk earthworks with a 15m drop in ground level over the 600m² work area. This job had some difficult but interesting problems in fitting 4 level building pads into the area provided. Due to other issues such as position and accessibility we were only be able to use body trucks to cart spoil off site. Environmental issues were also to be a consideration with the school pool, classrooms and canteen being at the bottom of the excavated site.