Client:                                     Gold Coast City Council

Project:                                   Landslip Remedial Works at Landman Court

Duration:                                 April 2014 – June 2014

Project Value:                         $335,975.00       

Project Details:                       The project involved the remedial works for landslip at Landman Court, Clagriba. The works mainly included the construction of a concrete crib wall. The material was supplied by Concrib. They are well known and recognized supplier for concrete crib wall panels. The installation of the wall was done by the well trained and experienced manpower of Main. The associated works included but not limited to installation of concrete drainage pipes through backfill granular material, concrete channel, subsoil drains, landscaping and fencing. This site had numerous challenges including local traffic, site access issues and the natural steepness of the work area.

 

Back
Landslip Remedial Works
Detail Download
Landslip Remedial Works
Detail Download
Landslip Remedial Works
Detail Download
Landslip Remedial Works
Detail Download
Landslip Remedial Works
Detail Download
Landslip Remedial Works
Detail Download
 
 
Powered by Phoca Gallery