Client:                                  Moreton Bay Regional Council

Project:                                Shirley Creek Drainage

Duration:                              May 2014 – June 2014

Project Value:                      $215,827.00

Project Details:                The objective of this project was to keep the Shirley Creek as continuously graded free draining invert in the creek thus allowing unobstructed minor stormwater discharges and reduce the ponding of water that has the potential to be a risk to public health and safety. The works included but were not limited to earthwork, rock layer & geogrid material for construction of access track, excavation works for creek diversion and landscaping. During the construction environmental impacts were successfully kept to a minimum by working continuously around the tide times.

Back
1410 Shirley Creek Drainage
Detail Download
1410 Shirley Creek Drainage
Detail Download
1410 Shirley Creek Drainage
Detail Download
1410 Shirley Creek Drainage
Detail Download
1410 Shirley Creek Drainage
Detail Download
1410 Shirley Creek Drainage
Detail Download
 
 
Powered by Phoca Gallery