Client:                                  Royal Wolf

Project:                                Royal Wolf Stormwater Drainage Upgrade

Duration:                             May 2016 - Jul 2016      

Project Value:                    $ 250,000

Project Details:                 Royal Wolf engaged Main Constructions to undertake drainage upgrade works at their depot in Banyo.The existing drainage was inadequate for the requirements of the site. This project involved the installation of a Humes Jellyfish tertiary treatment device which is a stormwater treatment system featuring membrane filtration which provides exceptional pollutant removal. The system uses gravity, flow rotation and up-flow membrane filtration to provide tertiary treatment to stormwater in an underground structure. Other works included earthworks and he installation of a concrete lined drainage channel and inlet basin. Works were completed in stages so as not to interfere with the company’s operations and additional works required on site by other contractors.

Back
1607 Royal Wolf
Detail Download
1607 Royal Wolf
Detail Download
1607 Royal Wolf
Detail Download
1607 Royal Wolf
Detail Download
1607 Royal Wolf
Detail Download
1607 Royal Wolf
Detail Download
 
 
Powered by Phoca Gallery