Client: Royal Wolf
Project: Royal Wolf Stormwater Drainage Upgrade
Duration: May 2016 - Jul 2016
Project Value: $ 250,000
Project Details: Royal Wolf engaged Main Constructions to undertake drainage upgrade works at their depot in Banyo.The existing drainage was inadequate for the requirements of the site. This project involved the installation of a Humes Jellyfish tertiary treatment device which is a stormwater treatment system featuring membrane filtration which provides exceptional pollutant removal. The system uses gravity, flow rotation and up-flow membrane filtration to provide tertiary treatment to stormwater in an underground structure. Other works included earthworks and he installation of a concrete lined drainage channel and inlet basin. Works were completed in stages so as not to interfere with the company’s operations and additional works required on site by other contractors.
As 2024 draws to a close we reflect on the year. South Pine Sports Complex Soccer Precinct was completed at the begining of May and we were pleased to hand over a community asset that will be sure to service the community for many years to come. We have also completed some smaller projects during the year and we now look forward towards 2025 with anticipation.
04/12/2024