Client:                                 Moreton Bay Regional Council

Project:                               MBRC Bus Stops 2

Duration:                            Jan 2016 – Apr 2016

Project Value:                   $230,000

Project Details:                Main Constructions was awarded the contract at the end of 2015 to Design and Construct bus shelters for 6 sites across the Moreton Bay Council area. The planning process was somewhat steam lined since we had previously completed 30 bus stops from design to completion. The existing bus stops were demolished and replaced with new concrete slabs and shelters. Auxiliary works included relocation of bins, installation of signs and tactiles, access paths, retaining walls and new seats. The new bus shelters were manufactured in our own workshop by our skilled tradesmen. Works varied across each of the locations. Traffic Management Plans were developed and implemented for each site to ensure the safety of workers and the public.

Back
MBRC Bus Stops 2
Detail Download
MBRC Bus Stops 2
Detail Download
MBRC Bus Stops 2
Detail Download
MBRC Bus Stops 2
Detail Download
MBRC Bus Stops 2
Detail Download
MBRC Bus Stops 2
Detail Download
 
 
Powered by Phoca Gallery