Client: Village Roadshow
Project: Top Golf Civil Works
Duration: January 2017 – February 2018
Project Value: $7,490,000
Project Details: Village Roadshow have embarked on another major project involving the construction of a golf driving range situated between Movie World and White Water World on the Gold Coast. Main Constructions was the successful tenderer to undertake the Bulk Earthworks and Civil Engineering Works for the project. The scope of works undertaken included clearing of the site, stormwater construction, trenching for services, underground tanks, construction of the building pad, block retaining walls and roadworks including carpark construction. Stormwater construction included digging up and re-using existing pipes from site which included inspection and repairs to these pipes. The challenge faced during this process was the unknown quantity of pipes that would be suitable for re-use meaning procurement of any additional pipes required could not be ascertained until all existing pipes had been excavated. Further stormwater works included concrete culverts and channels including construction of suspended slabs, manholes, inlets and catchpits, trench drain and headwalls and aprons. Other works included bored piers for the barrier poles and tilt panels and footings for the ball net. For these works Main Constructions utilised the specialised services of Civil Group (Aust) Pty Ltd working closely together to achieve the desired outcomes within the timeframe required.
As 2024 draws to a close we reflect on the year. South Pine Sports Complex Soccer Precinct was completed at the begining of May and we were pleased to hand over a community asset that will be sure to service the community for many years to come. We have also completed some smaller projects during the year and we now look forward towards 2025 with anticipation.
04/12/2024