Client:                                Griffith University

Project:                              SEET Relocation

Duration:                            Jan 2015 – May 2015

Project Value:                   $634,000

Project Details:                This project involved the relocation of the SEET (Science, Environment, Engineering and Technology) department due to excess stress in their current location on the suspended slab. Both the area the SEET department is moving from (N34) and the area they are moving to (N13) were stripped and renovated. Demolition works involved the removal of existing framework, block walls, linings, doors, floor coverings and other structures. Prior to demolition works commencing asbestos testing was undertaken and some non-friable asbestos was detected. Removal was undertaken once all work method statements and safety precautions were in place. Works also included the disconnection, relocation and re-establishment of all plant, workshop equipment, work benches and fixtures and fittings. Both the N13 and N34 areas are to be fitted out with new linings, doors, windows and ceilings. Other works undertaken included Electrical and Data works, Hydraulic works and Mechanical Works.

Back
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
1503 Griffith University SEET Relocation
Detail Download
 
 
Powered by Phoca Gallery