Client:                                Ipswich City Council

Project:                              D&C Karrabin Pedestrian Cycle Bridge

Duration:                          October 2019

Project Value:                  $415,000

Project Details:                This project was awarded to Main Constructions and involves undertaking detailed design and construction of a cycle/pedestrian bridge as part of Brassall Bikeway Stage 5 project works. Main Constructions objective was to provide a design which was a cost effective value for money solution to provide the 2.5m wide clear opening pedestrian bridge across Iron Pot Creek, linking Keswick Road and Diamantina Boulevard. The bridge structure will be constructed in sections at Main Constructions Fabrication yard and then transported to site for installation. Construction is from galvanised steel with the decking being Mini Mesh Decking panels.

Back
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
Pedestrian Cycle Bridge
Detail Download
 
 
Powered by Phoca Gallery